December 30, 2007
Day 13: ..and on this day on or about 5:00pm, it is finished. Refrigerator is in, water lines tapped in and connected. Range is in, gas line re-routed and connected. Tile is set and has been grouted. All seams caulked and leakproof. I still must finish the painting, and will...
December 29, 2007
Day 12: Dishwasher passed it's initial run, Tom had to shave the toe-kick just a hair, as it would not open all the way. I didn’t want to force it. Tom is a whiz and can fix anything! The refrigerator and range will be put into place tomorrow, and Tom assures me all will be...
December 28, 2007
Day 11: The light at the end of the tunnel. Sink wall with the countertop is in, along with dishwasher and SS sink w/disposal. It is so much closer to being done than being undone.
December 26, 2007
Day Nine: Over-the-range microwave is in…sink cabinet and connections for sink and dishwasher are in. Sub floor is down and prepped for the new flooring. Casings on doors are removed and will be replaced. You can only paint over these things just so many times. ...