description
Master Bath Near Completion
Posted Jun 20th, 10 at 11:15 pm by jlab
Tags
bathroom
,
flaren
,
hack
,
painted doors
,
subway tile
Three day weekend=kaput!
Master bath = nearly there.
Spent the last 3.5 days grouting, sealing, caulking, touch-up painting, vanity installing, faucet plumbing, lighting and accessorizing. Still need to figure out the whole giant-shelves-in-the-bathroom-and-what-to-put-on-them thing.
Still have to get shower glass installed (it will be here next week), and need the plumber to come back and figure out why the brand new shower head is leaking. I'm suspecting a washer/gasket type problem somewhere in the handle.
We painted the Flaren cabinet with Ben Moore Appalachian Brown over B-I-N Primer. Still need another coat on the doors and lots of touch-ups around the frame. Also had to chop down the interior shelves to fit them in front of the plumbing, and am looking for different hardware. LOVE the Hollviken/Apelskar combination on the sinks.


More to come!
Master bath = nearly there.
Spent the last 3.5 days grouting, sealing, caulking, touch-up painting, vanity installing, faucet plumbing, lighting and accessorizing. Still need to figure out the whole giant-shelves-in-the-bathroom-and-what-to-put-on-them thing.

Still have to get shower glass installed (it will be here next week), and need the plumber to come back and figure out why the brand new shower head is leaking. I'm suspecting a washer/gasket type problem somewhere in the handle.

We painted the Flaren cabinet with Ben Moore Appalachian Brown over B-I-N Primer. Still need another coat on the doors and lots of touch-ups around the frame. Also had to chop down the interior shelves to fit them in front of the plumbing, and am looking for different hardware. LOVE the Hollviken/Apelskar combination on the sinks.


More to come!
Total Comments 0




