More Accomplished.... Bits and Pieces
Posted Feb 15th, 12 at 8:22 pm by RmovingV
The backsplash is grouted, the sink is in (though it isnt fully plumbed), some more doors and trim have been installed, It feels much closer to being finished.





The 153 degree hinges were a bit of a pain to open, since they were in the bags all closed up. But My husband got them on and now our pantry has DOORS. Yay.
Left on the list for the kitchen are toe kicks, filler to the left of the fridge and above it, crown, painting the plywood fridge box, last few doors, putting stove in, plumbing dishwasher and fridge, outlet covers (and a tile repair under one of them), installing trash pull out, finish paint the ceiling and the walls and I am sure several other things I am not thinking of.
The 153 degree hinges were a bit of a pain to open, since they were in the bags all closed up. But My husband got them on and now our pantry has DOORS. Yay.
Left on the list for the kitchen are toe kicks, filler to the left of the fridge and above it, crown, painting the plywood fridge box, last few doors, putting stove in, plumbing dishwasher and fridge, outlet covers (and a tile repair under one of them), installing trash pull out, finish paint the ceiling and the walls and I am sure several other things I am not thinking of.