Spent some time this weekend putting up our slate tile. The thinset is still curing, so we're going to give it another day or two before grouting. After this picture was taken we filled some of the gaps that required cut tiles to fit.
Our cabinets are in and we're ready for flooring and backsplash. Most of the demo and assembly was done in a long weekend. Lots of details to take care of: molding, dampers, plinth, etc.